Команда похоже с профессиональным подходом.
17 сентября опубликовали как идет проект, подготовка и тестирование вариантов высадки, лебедка для подьема на утес Cape Fie и тд.
a.) preparing a safe way to land the operators and the equipment on Bouvet. A flexible system that allows for various conditions will be engineered, constructed and soon tested at a beach in Norway with enough swell. We are working on several different systems to adapt to the conditions. One system consist of 2 zodiaks, buoys, anchor, capstan and rope to safely land the dinghy with and without personell/equipment.
Gjermund and Rune LA7THA are working with some experienced Norwegian professionals within the maritime industry in Norway to test this system live.
b.) prepare a winch system for lifting the equipment up from the beach to the cliff at Cape Fie. Again we prepare for a flexible system that can adapt to various shapes and height of the cliff, we will use both electrical and non-electrical systems, and also manual systems. The most bulky item is the diesel generators (75 kg). System to be engineered, constructed and tested in Norway soon. Effort is being lead by Rune.
c.) a system to assist us in bringing the equipment from the cliff up to the camp roughly 200 ft up at 70ft ASL being planned.
https://www.dx-world.net/3y0j-dxpedi...bouvet-island/